Orion-system Lead Controller Uživatelský manuál Strana 44

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 56
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 43
Appendix A - Sample Con gurations
Lead/Lag Controller Technical Guide
44
Lead/Lag Example - Controlling 3 Sets of Pumps
Binary Input Con guration
Binary Enable Input #1 is a switch that can start and stop the boiler
pumps.
Binary Enable Input #2 is a switch that can start and stop the chiller
pumps.
Binary Enable Input #3 is a switch that can start and stop the do-
mestic pumps.
Figure 82: Binary Enable Input 1 Con guration
Figure 83: Binary Proof Input 1 Con guration
Binary Proof Input #1 is a water ow switch for the boiler pumps.
Binary Proof Input #2 is a water ow switch for the chiller pumps.
Binary Proof Input #3 is a water ow switch for the domestic water
pumps.
See Figure 82 for the con guration for Binary Enable Input #1 and
Figure 83 for the con guration for Binary Input Proof #1.
Zobrazit stránku 43
1 2 ... 39 40 41 42 43 44 45 46 47 48 49 ... 55 56

Komentáře k této Příručce

Žádné komentáře